The Apollo team delivered a reinforced concrete frame at Old Avenue, Weybridge, on a constrained residential site.
October 2020 to December 2021
Weybridge, Surrey



The Apollo team delivered a reinforced concrete frame at Old Avenue, Weybridge, on a constrained residential site.
The project involved constructing a concrete frame with two floors below ground and four floors above ground. Over 1,000 lorry loads of excavated material were removed from site, all via residential road.
Noise, dust, and disruption had to be carefully controlled. Measures included a dedicated wheel wash, no out of hours deliveries, and strict site management to minimise impact on residents.
The Apollo team worked closely with designers and structural engineers from day one, including early engagement with our piling subcontractor. All concrete works were undertaken directly by Apollo, allowing tight control over quality, sequencing, and programme.
The project was successfully completed and marked the largest project delivered by the Apollo team. Works ran to programme with minimal delays, despite the complexity and constraints of the site.